A well owner must obtain a permit and pay any required fees, including a well construction fee, before using any groundwater withdrawn from a well for purposes other than those exempted by Section 8871.103.
Tex. Spec. Dist. Loc. Laws § 8871.104
A well owner must obtain a permit and pay any required fees, including a well construction fee, before using any groundwater withdrawn from a well for purposes other than those exempted by Section 8871.103.
Tex. Spec. Dist. Loc. Laws § 8871.104