(a) The commission shall exempt from permit requirements a municipal solid waste management facility that is used in the transfer of municipal solid waste to a solid waste processing or disposal facility from: (1) a municipality with a population of less than 50,000;(2) a county with a population of less than 85,000; Text of subd. (3) as added by Acts 1993, 73rd Leg., ch. 802, Sec. 5
(3) a facility used in the transfer of municipal solid waste that will transfer 125 tons per day or less; and Text of subd. (3) as added by Acts 1993, 73rd Leg., ch. 899, Sec. 2.08 and Acts 1993, 73rd Leg., ch. 1045, Sec. 10
(3) a facility used in the transfer of municipal solid waste that transfers or will transfer 125 tons a day or less; or Text of subd. (4) as added by Acts 1993, 73rd Leg., ch. 802, Sec. 5 and Acts 1993, 73rd Leg., ch. 1045, Sec. 10
(4) a materials recovery facility that recycles for reuse more than 10 percent of its incoming nonsegregated waste stream if the remaining nonrecyclable waste is transferred to a permitted landfill not more than 50 miles from the materials recovery facility. Text of subd. (4) as added by Acts 1993, 73rd Leg., ch. 899, Sec. 2.08
(4) a materials recovery facility that recycles for reuse more than 10 percent of its incoming nonsegregated waste stream if the remaining nonrecyclable waste is transferred to a permitted Type I landfill not farther than 50 miles from the materials recovery facility.Text of subsec. (c) as added by Acts 1993, 73rd Leg., ch. 899, Sec. 2.08 and Acts 1993, 73rd Leg., ch. 1045, Sec. 10