Neb. Rev. Stat. §§ 86-1227

Current with changes through the 2024 First Special Legislative Session
Section 86-1227 - Technically feasible, defined

Technically feasible means that by virtue of engineering or spectrum usage, the proposed placement for a small wireless facility, or its design or site location, can be implemented without a reduction in the functionality of the small wireless facility.

Neb. Rev. Stat. §§ 86-1227

Laws 2019, LB 184, § 27.
Added by Laws 2019, LB 184,§ 27, eff. 9/1/2019.