Neb. Rev. Stat. §§ 70-1906

Current with changes through the 2024 First Special Legislative Session
Section 70-1906 - Construction of new renewable generation facilities; electric supplier; governing body; duties

The governing body of an electric supplier that has determined a need to construct new renewable generation facilities shall take reasonable steps to determine if one or more C-BED projects are available and are technically, economically, and operationally feasible to provide some or all of the identified generation need.

Neb. Rev. Stat. §§ 70-1906

Laws 2007, LB629, § 6; Laws 2016, LB 736, § 4.
Amended by Laws 2016, LB 736,§ 4, eff. 7/21/2016.