Neb. Rev. Stat. §§ 39-2812

Current with changes through the 2024 First Special Legislative Session
Section 39-2812 - Process; provisions applicable
(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816.
(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816.

Neb. Rev. Stat. §§ 39-2812

Laws 2016, LB 960, § 12; Laws 2022, LB 1016, § 6.
Amended by Laws 2022, LB 1016,§ 6, eff. 7/21/2022.
Added by Laws 2016, LB 960,§ 12, eff. 4/19/2016.