If the agency intends to engage in the operation of power projects, or the generation or supply of electric energy, the provisions of sections 18-2426 to 18-2434 shall apply.
Neb. Rev. Stat. §§ 18-2426
If the agency intends to engage in the operation of power projects, or the generation or supply of electric energy, the provisions of sections 18-2426 to 18-2434 shall apply.
Neb. Rev. Stat. §§ 18-2426