Should the requirements of RCW 77.100.100 through 77.100.160 not be met, the department shall seek immediate legal clarification of the steps which must be taken to fully mitigate water diversion projects on the Cedar river.
RCW 77.100.160
Effective date-1993 sp.s. c 2 ss 1-6, 8-59, and 61-79: See RCW 43.300.900.
Project designation-Legislative finding-Severability-1989 c 85: See notes following RCW 77.100.100.