Wash. Rev. Code § 69.25.090

Current through the 2024 Regular Session
Section 69.25.090 - Sanitary operation of official plants-Inspection refused if requirements not met
(1) The operator of each official plant shall operate such plant in accordance with such sanitary practices and shall have such premises, facilities, and equipment as are required by regulations promulgated by the director to effectuate the purposes of this chapter, including requirements for segregation and disposition of restricted eggs.
(2) The director shall refuse to render inspection to any plant whose premises, facilities, or equipment, or the operation thereof, fail to meet the requirements of this section.

RCW 69.25.090

1975 1st ex.s. c 201 § 10.