Wash. Rev. Code § 54.40.060

Current through 2024
Section 54.40.060 - Division of district

If the reclassification to a five commissioner district is approved by the voters, the public utility district commission within sixty days after the results of said election are certified shall divide the public utility district into two districts of as nearly equal population as possible, and shall designate the districts as District A and District B.

RCW 54.40.060

1994 c 223 § 60; 1977 ex.s. c 36 § 6; 1959 c 265 § 7.