Wash. Rev. Code § 49.105.030

Current through 2024
Section 49.105.030 - [Effective 1/1/2026] Certification verification
(1) Beginning January 1, 2026, contractors must ensure all fire-resistant material is applied by a certified fire-resistant material applicator prior to the individual applying any fire-resistant material. A contractor must verify that the individual is certified by the department by obtaining written documentation of the individual's certification.
(2) Contractors must retain the written documentation for a period of 10 years.

RCW 49.105.030

Added by 2023 c 145,§ 4, eff. 1/1/2026.

Effective date- 2023 c 145 s 4: "Section 4 of this act takes effect January 1, 2026." [2023 c 145 s 8.]