RCW 46.25.120
Effective date- 2023 c 35: See note following RCW 46.25.010.
Intent-Finding- 2022 c 16: See note following RCW 69.50.101.
Finding-Intent-2015 2nd sp.s. c 3: See note following RCW 10.21.055.
Intent-Construction-Effective date-1998 c 41: See notes following RCW 46.20.265.