The alternative selection process provided by this section may not be used in the selection of a person or entity to construct a publicly owned facility for the storage or transfer of solid waste or solid waste handling equipment unless the facility is either (a) privately operated pursuant to a contract greater than five years, or (b) an integral part of a solid waste processing facility located on the same site. Instead, the applicable provisions of RCW 35.22.620, and 35.23.352, and chapters 39.04 and 39.30 RCW shall be followed.
RCW 35.21.156
Legislative findings-Construction-1986 c 282 ss 17-20: "The legislature finds that the regulation, management, and disposal of solid waste through waste reduction, recycling, and the use of resource recovery facilities of the kind described in RCW 35.92.022 and 36.58.040 should be conducted in a manner substantially consistent with the priorities and policies of the solid waste management act, chapter 70.95 RCW. Nothing contained in sections 17 through 20 of this act shall detract from the powers, duties, and functions given to the utilities and transportation commission in chapter 81.77 RCW." [ 1986 c 282 s 16.]
Liberal construction-Supplemental powers-1986 c 282 ss 16-20: "Sections 16 through 20 of this act, being necessary for the health and welfare of the state and its inhabitants, shall be liberally construed to effect its purposes. Sections 16 through 20 of this act shall be deemed to provide an alternative method for the performance of those subjects authorized by these sections and shall be regarded as supplemental and additional to powers conferred by the Washington state Constitution, other state laws, and the charter of any city or county." [ 1986 c 282 s 21.]