Current through Pa Acts 2024-53, 2024-56 through 2024-92
Section 1650.6 - Infrastructure reports(a) Certification.-- At least six months prior to the effective dates of the mandated content requirements contained in sections 3(a)(1), (2), (3) and (4) and 4, the department and the Department of Transportation shall jointly make a certification as to whether there is sufficient transportation, distribution and other necessary infrastructure, including rail capability and terminal facilities, in this Commonwealth to meet the requirements of this act.(b) Hearing.--The department and the Department of Transportation shall conduct at least three public hearings across this Commonwealth for each report required under this act.(c) Posting.--The infrastructure reports shall be submitted to the General Assembly and posted and maintained on each department's publicly accessible Internet website.(d) Insufficient infrastructure.--If any infrastructure report determines that there is insufficient infrastructure in place to meet any of the mandated volume standard requirements contained in section 3 or 4, that mandated content requirement shall be delayed at least six months or until the department and the Department of Transportation certify that sufficient infrastructure is in place through the issuance of a new infrastructure report, whichever is later.2008, July 10, P.L. 1009, No. 78, §6, effective in 90 days [ 10/8/2008].