52 Pa. Stat. § 1396.3b

Current through Pa Acts 2024-53, 2024-56 through 2024-111
Section 1396.3b - Specifications for construction projects

It shall be the duty of architects, engineers, or other persons preparing specifications for construction projects and which specifications include the requirement that the construction contractor supply fill for such project, to include within such specifications a specific reference to this act and the regulations pertaining thereto adopted by the department. If such a reference is omitted from the specifications and reclamation and planting of the land from which the fill was removed by the construction contractor is required under this act, any contract based on such specifications may be amended, at the option of the construction contractor, to allow a reasonable price for the reclamation and planting of the land affected in accordance with a plan acceptable to the secretary.

52 P.S. § 1396.3b

1945, May 31, P.L. 1198, § 3.2, added 1971, Nov. 30, P.L. 554, No. 147, § 4. Amended 1980, Oct. 10, P.L. 835, No. 155, § 4, imd. effective.