75 Pa. C.S. § 8914

Current through Pa Acts 2024-53, 2024-56 through 2024-111
Section 8914 - Further subsequent authorizations

Upon completion of the turnpike extensions and improvements set forth in sections 8911 (relating to improvement and extension authorizations), 8912 (relating to subsequent extension authorizations) and 8913 (relating to additional subsequent extension authorizations), the commission is hereby authorized and empowered to construct, operate and maintain further extensions and improvements of the turnpike at such specific locations and according to such schedules as shall be deemed feasible and which shall be approved by the commission, subject to the waiver of the Federal toll prohibition provisions where applicable, as follows:

(1) From a point at or near the intersection of State Route 65 and Crows Run Road in Beaver County, in a southeasterly direction to a point at or near the Perry Highway Interchange of the Pennsylvania Turnpike.
(2) From a point at or near Exit 5 of the turnpike northerly to Brookville, Jefferson County, to a point at the intersection with Interstate Route 80.
(3) From a point at or near the Pennsylvania Turnpike System into various areas of Berks County in order to complete the construction of the inner loop system and outer loop system of highways surrounding the City of Reading and to complete the missing links on Routes 222 to 422 to 1035.
(4) From a point at or near the intersections of Interstate Route 70, Interstate Route 76 and T.R.119 in the Borough of Youngwood, Westmoreland County, in a northerly direction along T.R.119 and T.R.66 to the intersection of T.R.22 with a bypass around the City of Greensburg, Westmoreland County; thence north on T.R.66 to T.R.356; thence north on T.R.356 to the intersection with T.R.28.
(5) From a point at or near the intersection of T.R.66 and T.R.22 in Salem Township, Westmoreland County; thence in a westerly direction paralleling T.R.22 to Exit 6 of Interstate 76.

75 Pa.C.S. § 8914

1992, Nov. 24, P.L. 725, No. 109, § 2, effective in 60 days.