(B) This section and sections 6111.044 to 6111.049 of the Revised Code establish a program for regulation of the injection of sewage, industrial waste, hazardous waste, and other wastes into wells in order to control pollution of the waters of the state, to prevent contamination of underground sources of drinking water, and to satisfy all requirements of the "Safe Drinking Water Act," 88 Stat. 1661 (1974), 42 U.S.C.A. 300(f), as amended, regarding injection wells as defined in regulations adopted under that act. This section and sections 6111.044 to 6111.049 of the Revised Code do not apply to the drilling, conversion, and operation of wells that are subject to Chapter 1509. of the Revised Code. The director of environmental protection, in consultation with the director of natural resources, shall adopt rules in accordance with Chapter 119. of the Revised Code governing the injection of sewage, industrial waste, hazardous waste, and other wastes into wells. The rules shall include provisions regarding all of the following:
(1) Applications for and issuance and renewal of injection well drilling and injection well operating permits. The term of an injection well operating permit shall be five years, except that in the case of the injection well drilling permit or renewal of an injection well operating permit, as appropriate, that is first issued on or after the effective date of this amendment for a class I injection well that is in operation on that date, the term of the permit shall be not less than four nor more than six years as determined by the director.(2) Terms and conditions of such permits;(3) Entry to conduct inspections to ascertain compliance with this section, sections 6111.044, 6111.045, and 6111.047 of the Revised Code, and rules adopted and orders and terms and conditions of permits issued thereunder;(4) Contingencies involving the mechanical integrity of class I injection wells, including requirements for the automatic shutdown of an injection well if pressures or the temperature or specific gravity of the sewage, industrial waste, hazardous waste, or other wastes differs from prescribed allowances;(5) A requirement that a seismic reflection data survey be conducted at each injection site where a class I injection well is located or proposed to be located in order to determine the presence or absence of such geologic faults or fractures as may be identified by seismic reflection survey data within or near the area around the well where formation pressures may be increased due to the operation of the well. If, prior to the effective date of division (B)(5) of this section, a seismic reflection data survey was conducted at an injection site in accordance with a work plan approved by the director or a seismic reflection data survey was conducted at an injection site and the results were approved in writing by the director, the rules adopted under that division shall not require that a new survey be conducted. If there is a change in the area of review of an injection well that is located at an injection site for which a seismic reflection data survey has been conducted, or if a new injection well is proposed to be located at such an injection site, the rules shall require that the owner or operator of the injection site reevaluate the data obtained from the survey. The rules shall require that if, after a reevaluation of the existing survey data, the director determines that the existing data are inadequate to determine the presence or absence of geologic faults or fractures within the altered area of review or to determine the presence or absence of geologic faults or fractures within the area of pressure buildup of the new well, the director may require the owner or operator to submit such additional seismic reflection data as the director considers necessary or appropriate. All seismic reflection data surveys shall be conducted in accordance with the standards established in rules adopted by the director.(6) A requirement that when the director has reason to believe that the operation of a class I injection well may cause seismic disturbances, a passive seismicity monitoring program be maintained at or near the injection site. The rules adopted under division (B)(6) of this section may require that a microseismicity monitoring program be maintained at an injection site when determined to be necessary or appropriate by the director. All seismicity monitoring programs shall be conducted in accordance with standards established in rules adopted by the director.(7) Definitions of the various classes of injection wells;(8) A determination of the areas of review of injection wells;(9) Other provisions in furtherance of the goals of this section and the "Safe Drinking Water Act," 88 Stat. 1661 (1974), 42 U.S.C.A. 300(f), as amended. The rules adopted under this section shall be consistent with that act and the regulations adopted under it, except that the director may adopt rules under this section that are more stringent than that act and the regulations adopted under it when he determines that they are inadequate to protect human health or the environment.