Upon completion of any facility, the utility shall remove, or cause to be removed, all tools, equipment, or other property used in the construction of the facility and, if railroad property was moved or disturbed, restore that property to the condition of the property before being moved or disturbed.
N.D.C.C. § 49-09.1-10