N.D. Cent. Code § 43-35-19

Current through 2023 Legislative Sessions
Section 43-35-19 - Standards for well drilling - Reports required

All construction of water wells must comply with the rules adopted by the department of environmental quality. Within thirty days after the completion of each well, each water well contractor shall furnish to the board on forms provided by the board any information required by the department of environmental quality, including a log of formations penetrated, well depth, and casing size and weight. A copy of each report also must be furnished to the customer. All information submitted must remain the property of the board.

N.D.C.C. § 43-35-19

Amended by S.L. 2017, ch. 199 (SB 2327),§ 45, eff. 4/29/2019.