N.D. Cent. Code § 43-19.1-28

Current through 2024 Legislative Session
Section 43-19.1-28 - Public works

Except as otherwise provided by law, the state and its political subdivisions may not engage in the construction of public works involving the practice of professional engineering when the contemplated expenditure for the project exceeds the sum of two hundred thousand dollars, unless the engineering drawings and specifications and estimates have been prepared by, and the construction administration and construction observation services are executed under the supervision of, a registered professional engineer. Any engineering contract executed in violation of this section is void.

N.D.C.C. § 43-19.1-28

Amended by S.L. 2019, ch. 381 (HB 1356),§ 1, eff. 8/1/2019.
Amended by S.L. 2015, ch. 154 (HB 1426),§ 2, eff. 8/1/2015.
See S.L. 2015, ch. 154 (HB 1426), § 4.