The examination for applicants for licensure must consist of:
The questions for the sewer and water contractor and the building sewer and water installer need not be the same. The passing grade for the building sewer and water contractor must be eighty percent, and the sewer and water installer's passing grade must be seventy percent.
N.D.C.C. § 43-18.2-07