N.D. Cent. Code § 24-03-08

Current through 2024 Legislative Session
Section 24-03-08 - Determinations of surface water flow and appropriate highway construction

Whenever and wherever a highway under the supervision, control, and jurisdiction of the department or under the supervision, control, and jurisdiction of the board of county commissioners of any county or the board of township supervisors has been or will be constructed over a watercourse or draw into which flow surface waters from farmlands, the department of water resources, upon petition of the majority of landowners of the area affected or at the request of the board of county commissioners, township supervisors, or a water resource board, shall determine as nearly as practicable the design discharge that the crossing is required to carry to meet the stream crossing standards prepared by the department and the department of water resources. When the determination has been made by the department of water resources, the department of transportation, the board of county commissioners, or the board of township supervisors, as the case may be, upon notification of the determination, shall install a culvert or bridge of sufficient capacity to permit the water to flow freely and unimpeded through the culvert or under the bridge. The department, county, and township are not liable for any damage to any structure or property caused by water detained by the highway at the crossing if the highway crossing has been constructed in accordance with the stream crossing standards prepared by the department and the department of water resources.

N.D.C.C. § 24-03-08

Amended by S.L. 2021, ch. 488 (HB 1353),§ 12, eff. 8/1/2021.