Current through L. 2024, c. 87.
Section 58:11-9.6 - Renewal of permit, prerequisites toThe State department, before it renews any permit, shall be satisfied of the following facts:
(a) That the approved physical connection has been tested for tightness under prevailing pressure conditions at least every 3 months;(b) That the approved physical connection has been subjected to an internal inspection within 6 months prior to the application; and(c) That the local board of health, the State department, and the owner of the water supply set forth in section 3 of this act, have determined that the approved physical connection was functioning satisfactorily.L.1942, c.308, p.1141, s.6; amended by L.1966, c.47, s.5, eff. 5/24/1966.