N.J. Stat. § 58:10A-37.5b

Current through L. 2024, c. 80.
Section 58:10A-37.5b - Development of cost guidance document, publication

The department shall develop a cost guidance document that establishes the maximum cost to be paid for the eligible project costs of the closure or replacement of a petroleum underground storage tank used to store heating oil for onsite consumption in a residential building or a petroleum underground storage tank with a capacity of 2,000 gallons or less used to store heating oil for onsite consumption in a nonresidential building. Within 90 days after the effective date of P.L. 2009, c. 134(C.58:10A-37.5b et al.), the department shall publish the cost guidance document in the New Jersey Register. The department may revise the cost guidance document as necessary and shall publish the revised cost guidance document within 30 days following adoption of any revision. The adoption of a cost guidance document, or of any revision thereto, shall not be subject to the "Administrative Procedure Act," P.L. 1968, c.410 (C.52:14B-1 et seq.).

N.J.S. § 58:10A-37.5b

Added by L. 2009, c. 134,s. 4, eff. 10/1/2009.