Current through 82nd (2023) Legislative Session Chapter 535 and 34th (2023) Special Session Chapter 1 and 35th (2023) Special Session Chapter 1
Section 445A.580 - Continuing planning process The Department shall establish a continuing planning process consistent with all applicable federal requirements which results in plans for all waters of the State and includes:
1. Adequate effluent limitations and schedules of compliance;2. The incorporation of all elements of any applicable areawide plans for management of waste and plans for basins under NRS 445A.300 to 445A.730, inclusive;3. Total maximum daily load for pollutants and contaminants;4. Procedures for revision of the plans;5. Adequate authority for intergovernmental cooperation;6. Adequate implementation, including schedules of compliance, for revised or new standards of water quality;7. Controls over the disposition of all residual waste from any treatment of water;8. An inventory and ranking, in order of priority, of needs for construction of treatment works; and9. Controls over the injection of fluids through a well to prevent the degradation of underground water.Added to NRS by 1973, 1713; A 1985, 767Added to NRS by 1973, 1713; A 1985, 767