Current through 82nd (2023) Legislative Session Chapter 535 and 34th (2023) Special Session Chapter 1 and 35th (2023) Special Session Chapter 1
Section 341.151 - Calculation of final total cost of building including initial construction costs and operating costs for expected useful life of building; statement of proposed source of funding1. The Division shall provide for a system of accounting for the total costs of state buildings throughout their expected useful life, taking into account all expenses of maintenance and operation.2. Each proposal for the construction of a state building must include: (a) Figures showing the final total cost of the building, which is the sum of:(1) Initial construction costs; and(2) Operating costs for the expected useful life of the building, including maintenance, heating, lighting and air-conditioning; and(b) A statement of the proposed source of funding for the final total cost of the building.Added to NRS by 1977, 276; A 1997, 2486; 2013, 396Amended by 2013, Ch. 111,§7, eff. 5/24/2013.Added to NRS by 1977, 276; A 1997, 2486