Current through 82nd (2023) Legislative Session Chapter 535 and 34th (2023) Special Session Chapter 1 and 35th (2023) Special Session Chapter 1
Section 338.169 - Public body authorized to construct public work by selecting and entering into contracts with construction manager at risk; limitations1. Subject to the provisions of subsection 2, a public body may construct a public work by: (a) Selecting a construction manager at risk pursuant to the provisions of NRS 338.1691 to 338.1696, inclusive; and(b) Entering into separate contracts with a construction manager at risk: (1) For preconstruction services, including, without limitation:(I) Assisting the public body in determining whether scheduling or constructability problems exist that would delay the construction of the public work;(II) Estimating the cost of the labor and material for the public work; and(III) Assisting the public body in determining whether the public work can be constructed within the public body's budget; and(2) To construct the public work.2. A public body in a county whose population is less than 100,000 may enter into contracts with a construction manager at risk pursuant to NRS 338.1685 to 338.16995, inclusive, for the construction of not more than two public works in a calendar year that are discrete projects.Added to NRS by 2007, 2891; A 2009, 437; 2011, 3694; 2013, 2974; R 2013, 2986; R 2017, 4035; A 2021, 736, 2218Amended by 2021, Ch. 371,§3, eff. 6/4/2021.Amended by 2021, Ch. 165,§4, eff. 5/27/2021.Repealed by 2013, Ch. 487,§14.7, eff. 7/1/2017.Amended by 2013, Ch. 487,§7.5, eff. 7/1/2013.Added to NRS by 2007, 2891; A 2009, 437; 2011, 3694