Current through the 2023 Regular Session
Section 82-4-225 - [Effective Until Occurrence of Contingency] Application for permit amendment(1) A permittee may apply to increase the permit boundary, but an increase may not extend the period for which an original permit was issued. The operator shall file an amendment application and map in the same form and with the same content as required for an original application under this part and shall file with the department a supplemental bond in the amount to be determined under 82-4-223 for each acre or fraction of an acre of the increase approved. All procedures of this part pertaining to original applications apply to applications for the increase of the permit area, except for incidental boundary revisions and minor revisions.(2) If the department approves a reduction in the acreage covered by the original or supplemental permit, it shall release the bond for each acre reduced, but the bond may not be reduced below $10,000, except as provided in 82-4-223. (Terminates on occurrence of contingency-- sec. 6, Ch. 524, L. 2023.)Amended by Laws 2023, Ch. 524,Sec. 4, eff. 10/1/2023.En. Sec. 7, Ch. 325, L. 1973; amd. Sec. 2, Ch. 352, L. 1977; R.C.M. 1947, 50-1040; amd. Sec. 8, Ch. 550, L. 1979; amd. Sec. 3, Ch. 127, L. 2005.Contingent Termination: Section 6 of Laws 2023, Ch. 524 provides: "[This act] terminates on the date that the department of environmental quality certifies to the code commissioner that the office of surface mining of the United States department of the interior disapproves the changes to Montana's program that are provided in [this act]. The department of environmental quality shall submit certification within 60 days of the occurrence of the contingency."
This section is set out more than once due to postponed, multiple, or conflicting amendments.