If a permit is required pursuant to this article due to the presence of a protected natural resource other than a high and moderate value inland waterfowl and wading bird habitat, an excavation or quarry that was authorized pursuant to article 6, 7 or 8-A before June 8, 2006 is not required to meet standards associated solely with the upland portion of a high and moderate value inland waterfowl and wading bird habitat.
[2007, c. 616, §1(NEW).]
The department may not issue a permit pursuant to this article for an excavation or quarry requiring authorization pursuant to article 6, 7 or 8-A after June 8, 2006 and located in the upland portion of a high and moderate value waterfowl and wading bird habitat.
[2007, c. 616, §1(NEW).]
38 M.R.S. § 480-GG