[1989, c. 890, Pt. A, §40(AFF); 1989, c. 890, Pt. B, §10(AMD).]
[2013, c. 300, §9(AMD).]
[1999, c. 243, §1(AMD).]
[2011, c. 653, §10(AMD); 2011, c. 653, §33(AFF); 2011, c. 657, Pt. W, §5(REV).]
[1991, c. 499, §11(RP).]
[2011, c. 653, §11(RPR); 2011, c. 653, §33(AFF).]
[1991, c. 824, Pt. A, §82(RP).]
TABLE I
MAXIMUM FEES IN DOLLARS
TITLE 36 SECTION | PROCESSING FEE | CERTIFICATION FEE | |
656, sub-§ 1, ¶E, Pollution Control Facilities | |||
A. Water pollution control facilities with capacities at least 4,000 gallons of waste per day and § 1760, sub-§ 29, water pollution control facilities | $250 | $20 | |
B. Air pollution control and § 1760, sub-§ 30, air pollution control facilities | 250 | 20 |
TITLE 38 SECTION | PROCESSING FEE | LICENSE FEE | ||||||||
344, sub-§ 7, Permit by rule | $250 | $0 | ||||||||
413, Waste discharge licenses | See section 353-B | |||||||||
420-D, Storm water management | ||||||||||
A. If structural means of storm water control are used | $400 for the first acre of disturbed area, plus $200 for each additional whole acre of disturbed area | $100 for the first acre of disturbed area, plus $50 for each additional whole acre of disturbed area | ||||||||
B. If solely vegetative means of storm water control are used | $200 for the first acre of disturbed area, plus $100 for each additional whole acre of disturbed area | $50 for the first acre of disturbed area, plus $25 for each additional whole acre of disturbed area | ||||||||
C. When a permit by rule is required | $55 | none | ||||||||
If a project described in paragraph A or B is reviewed and approved by a professional engineer at a soil and water conservation district office that has a memorandum of understanding with the department concerning review of projects pursuant to this section, the total applicable fee is reduced to a processing fee of $100 for the first acre of disturbed area, plus a license fee of $50 for each additional whole acre of disturbed area. | ||||||||||
480-E, Natural resources protection | ||||||||||
A. Any alteration of a protected natural resource, except coastal wetlands and coastal sand dunes, causing less than 20,000 square feet of alteration of the resource | 140 | 50 | ||||||||
B. Any alteration of a coastal wetland causing less than 20,000 square feet of alteration of the resource | 240 | 60 | ||||||||
C. Any alteration of a protected natural resource, except coastal sand dunes, causing 20,000 square feet or more of alteration of the resource | .015/sq. ft. alteration | .005/sq. ft. alteration | ||||||||
C-1. Significant groundwater well | 4,577 | 1,961 | ||||||||
C-2. Activity within a community public water supply primary protection area | 183 | 64 | ||||||||
D. Any alteration of a coastal sand dune | 3,500 | 1,500 | ||||||||
E. Condition compliance | 84 | 0 | ||||||||
F. Minor modification | 184 | 0 | ||||||||
485-A, Site location of development | ||||||||||
A. Residential subdivisions | ||||||||||
1. Affordable housing | 50/lot | 50/lot | ||||||||
2. On public water and sewers | 175/lot | 175/lot | ||||||||
3. All Other | 250/lot | 250/lot | ||||||||
B. Industrial parks | 460/lot | 460/lot | ||||||||
C. Mining | 1,500 | 1,000 | ||||||||
D. Structures | 4,000 | 2,000 | ||||||||
E. Other | 1,000 | 1,000 | ||||||||
543, Oily waste discharge | 40 | 160 | ||||||||
560, Vessels at anchorage | 125 | 100 | ||||||||
587, Ambient air quality or emissions standards variances | 5,050 | 50 | ||||||||
590, Air emissions licenses | See section 353-A | |||||||||
633, Hydropower projects | ||||||||||
A. New or expanded generating capacity | 450/MW | 50/MW | ||||||||
B. Maintenance and repair or other structural alterations not involving an increase in generating capacity | 150 | 150 | ||||||||
33 United States Code, Chapter 26, Water Quality Certifications, in conjunction with applications for hydropower project licensing or relicensing | ||||||||||
A. Initial consultation | 1,000 | 0 | ||||||||
B. Second consultation | 1,000 | 0 | ||||||||
C. Application | ||||||||||
1. Storage | 1,000 | 0 | ||||||||
2. Generating | 300/MW | 50/MW | ||||||||
1304, Waste management | ||||||||||
A. Septage disposal | ||||||||||
1. Site designation | 50 | 25 | ||||||||
B. Land application of sludges and residuals program approval | ||||||||||
1. Industrial sludge | 400 | 400 | ||||||||
2. Municipal sludge | 300 | 275 | ||||||||
3. Bioash | 300 | 275 | ||||||||
4. Wood ash | 300 | 75 | ||||||||
5. Food waste | 300 | 75 | ||||||||
6. Other residuals | 300 | 175 | ||||||||
C. Landfill | ||||||||||
1. Closing plans for secure landfills | 1,500 | 1,500 | ||||||||
2. Closing plans for attenuation landfills | 500 | 500 | ||||||||
3. Post-closure report | 175 | 175 | ||||||||
4. Preliminary information reports | 175 | 175 | ||||||||
5. License transfers | 500 | 175 | ||||||||
6. Special waste disposal | ||||||||||
a. One-time disposal of quantities of 6 cubic yards or less | 50 | 50 | ||||||||
b. One-time disposal of quantities greater than 6 cubic yards | 100 | 100 | ||||||||
c. Program approval for routine disposal of a special waste | 300 | 300 | ||||||||
7. Minor revision for secure landfills | 600 | 100 | ||||||||
8. Minor revision for attenuation landfills | 100 | 100 | ||||||||
9. Public benefit determination | 175 | 175 | ||||||||
D. Incineration facility | ||||||||||
2. License transfer | 175 | 175 | ||||||||
E. License transfer other than for landfills and incinerators | 100 | 100 | ||||||||
F. Minor revision for septage facilities and solid waste facilities other than landfills | 100 | 100 | ||||||||
G. Permit by rule for one-time activities | 100 | 100 |
TABLE II
WASTE MANAGEMENT FEES - ANNUAL LICENSE
MAXIMUM FEES IN DOLLARS
TITLE 38 SECTION | PROCESSING FEE | ANNUAL LICENSE FEE | |||||
1278, Asbestos abatement | |||||||
A. Asbestos abatement contractor | $0 | $650 | |||||
B. Asbestos abatement worker | 0 | 50 | |||||
C. Asbestos consultant | 0 | 650 | |||||
D. Asbestos analytical laboratory | 0 | 400 | |||||
E. Training provider | 0 | 500 | |||||
F. Other categories of asbestos professionals except asbestos abatement workers | 0 | 100 | |||||
G. Notification | |||||||
1. Project size greater than 100 square feet or 100 linear feet and less than 500 square feet or 2,500 linear feet | 100 | 0 | |||||
2. Project size 500 square feet or 2,500 linear feet, or greater, and less than 1,000 square feet or 5,000 linear feet | 150 | 0 | |||||
3. Project size 1,000 square feet or 5,000 linear feet, or greater | 300 | 0 | |||||
1304, Waste management | |||||||
A. Septage disposal | |||||||
1. Landspreading | $550 | $250 | |||||
2. Storage | 50 | 75 | |||||
B. Residuals compost facility | |||||||
1. Type I | 150 | 150 | |||||
3. Type II and Type III less than 3,500 cubic yards | 700 | 500 | |||||
5. Type II and Type III 3,500 cubic yards or greater | 1,400 | 850 | |||||
C. Land application of sludges and residuals | |||||||
1. Sites with program approval | |||||||
a. Industrial sludge | 150 | 250 | |||||
b. Municipal sludge | 75 | 200 | |||||
c. Bioash | 75 | 200 | |||||
d. Wood ash | 50 | 125 | |||||
e. Food waste | 50 | 125 | |||||
f. Other residuals | 50 | 125 | |||||
2. Sites without program approval | |||||||
a. Industrial sludge | 300 | 550 | |||||
b. Municipal sludge | 150 | 250 | |||||
c. Bioash | 150 | 250 | |||||
d. Wood ash | 75 | 200 | |||||
e. Food waste | 75 | 200 | |||||
f. Other | 75 | 200 | |||||
1310-N, Solid waste facility siting | |||||||
A. Landfill | |||||||
1. Existing, nonsecure municipal solid waste landfills accepting waste from fewer than 15,000 people | 3,500 | 1,000 | |||||
2. Existing, nonsecure municipal solid waste landfills accepting waste from more than 15,000 people | 3,500 | 3,500 | |||||
3. New or expanded for secure landfill | 5,000 | 8,500 | |||||
5. Nonsecure wood waste or demolition debris landfills, or both, if less than or equal to 6 acres | 700 | 750 | |||||
B. Incineration facilities | |||||||
1. New or expanded for the acceptance of municipal or special wastes, or both | 3,500 | 5,000 | |||||
2. Municipally owned and operated solid waste incinerators with licensed capacity of 10 tons per day or less | 3,500 | 1,000 | |||||
C. Transfer station and storage facility | 750 | 175 | |||||
D. Tire storage facility | 400 | 450 | |||||
F. Processing facility other than municipal solid waste composting | 700 | 700 | |||||
G. Beneficial use activities other than agronomic utilization | |||||||
3. Fuel substitution | 700 | 500 | |||||
4. Beneficial use without risk assessment | 700 | 200 | |||||
5. Beneficial use with risk assessment | 1,400 | 500 | |||||
H. Permit by rule for ongoing activities | 100 | 100 |
[2021, c. 186, §3(AMD).]
[1995, c. 462, Pt. A, §73(RP).]
[2011, c. 120, §3(RP).]
38 M.R.S. § 352