(a) Authority. — Shall mean the Electric Power Authority.
(b) Provisional connection. — Is that which is done for the duration of the interruption of electric power service.
(c) Fixed power generator. — Is one which is permanently installed in a site and connected through a double-throw or transfer switch be it automatic or manual.
(d) Portable power generator. — Is one which is not permanently installed in a site and is designed to supply power directly to electrical equipment or appliances.
History —Sept. 1, 1990, No. 83, p. 493, § 1, eff. 30 days after Sept. 1, 1990.