§ 241. Definitions

(a) Authority. — Shall mean the Electric Power Authority.

(b) Provisional connection. — Is that which is done for the duration of the interruption of electric power service.

(c) Fixed power generator. — Is one which is permanently installed in a site and connected through a double-throw or transfer switch be it automatic or manual.

(d) Portable power generator. — Is one which is not permanently installed in a site and is designed to supply power directly to electrical equipment or appliances.