The architect or engineer contracted by the developer to design the housing complex shall designate the area for the recovery of recyclable material, pursuant to the needs the number of units of each complex.
History —May 10, 2002, No. 61, § 3.
The architect or engineer contracted by the developer to design the housing complex shall designate the area for the recovery of recyclable material, pursuant to the needs the number of units of each complex.
History —May 10, 2002, No. 61, § 3.