In any action alleging defective building design, construction, materials, or supplies where the injury, death, or property damage occurs more than five (5) years after the date of completion of construction or incorporation of materials or supplies into the building, there shall be a presumption that the building was not defective in design, construction, materials, or supplies. This presumption may be overcome by a preponderance of the evidence to the contrary.
KRS 198B.135
Created 1992 Ky. Acts ch. 154, sec. 1, effective7/14/1992.