If, based on such review, the chief engineer finds that the local enhanced management plan is acceptable for consideration, the chief engineer shall initiate, as soon as practicable thereafter, proceedings to designate a local enhanced management area.
The chief engineer shall conduct a subsequent hearing or hearings only if the initial public hearing is favorable on all three issues of fact and the expansion of geographic boundaries is not recommended. At least 30 days prior to the date set for any hearing, written notice of such hearing shall be given to every person holding a water right of record within the area in question and by one publication in any newspaper of general circulation within the area in question. The notice shall state the question and shall denote the time and place of the hearing. At every such hearing, documentary and oral evidence shall be taken and a complete record of the same shall be kept.
The chief engineer is hereby authorized to delegate the enforcement of any corrective control provisions ordered for a local enhanced management area to the groundwater management district in which that area is located, upon written request by the district.
K.S.A. 82a-1041