may, upon proper application in writing and upon good cause shown, grant a permit for transporting heavy vehicles and loads or other objects not conforming to this article, including a vehicle transporting an ocean going container, if the department or authority finds that other traffic will not be seriously affected and the highway or bridge will not be seriously damaged.
from one-half (1/2) hour before sunrise to one-half (1/2) hour after sunset.
The total gross weight, with load of a vehicle or combination of vehicles transporting an ocean going container may not exceed ninety-five thousand (95,000) pounds. A permit issued under this section must be issued on an annual basis. A permit issued under this subsection may not impose a limit on the number of movements generated by the applicant or operator of a vehicle granted a permit under this subsection.
IC 9-20-6-2
Pre-1991 Recodification Citation: 9-8-1-16(a); (b).