After establishment of grades and receipt of the plans and specifications from the engineer, the petitioners, at their own expense, and under the direction of the engineer, shall improve the road according to plans and specifications.
IC 8-19-3-2
After establishment of grades and receipt of the plans and specifications from the engineer, the petitioners, at their own expense, and under the direction of the engineer, shall improve the road according to plans and specifications.
IC 8-19-3-2