Notwithstanding IC 8-1-2-103(a), a utility may adjust an unusually large bill if the excess usage reflected in the bill is caused by physical damage to any facility or equipment supplying water to the premises and the damage:
IC 8-1.5-3.5-3
Notwithstanding IC 8-1-2-103(a), a utility may adjust an unusually large bill if the excess usage reflected in the bill is caused by physical damage to any facility or equipment supplying water to the premises and the damage:
IC 8-1.5-3.5-3