Except as otherwise allowed by IC 36-7-4-1109, if a project owner installs a CSE system in a unit, the project owner shall plant, establish, and maintain for the life of the CSE system perennial vegetated ground cover on the ground around and under solar panels, and in project site buffer areas. The use of pollinator seed mixes in the planting of ground cover required by this section is encouraged. A unit or permit authority may require a project owner to prepare for a project site a vegetation plan that:
in order to reduce storm water runoff and erosion at the site and to provide habitat for wildlife and insects; and
IC 8-1-42-11