Current through P.L. 171-2024
Section 5-30-7-9 - Ownership of drawings, specifications, and information(a) Unless and until a proposal is accepted, the drawings, specifications, and other information in the proposal are the property of the offeror.(b) After a proposal is accepted, ownership of the drawings, specifications, and information in the drawings and specifications shall be determined under Indiana law and the terms of the design-build contract.As added by P.L. 74-2005, SEC.1.