Current through P.L. 171-2024
Section 5-22-2-2 - "Change order""Change order" means a written order that:
(1) is signed by the purchasing agent; and(2) directs the contractor to make changes that the contract authorizes the purchasing agent to order without the consent of the contractor.As added by P.L. 49-1997, SEC.1.