A contract awarded under this article must include the requirements of IC 5-22-15-25(c) unless the head of the purchasing agency makes a determination under IC 5-22-15-25(d).
IC 5-22-17-14
A contract awarded under this article must include the requirements of IC 5-22-15-25(c) unless the head of the purchasing agency makes a determination under IC 5-22-15-25(d).
IC 5-22-17-14