Each tier 1 contractor must contribute in:
at least fifteen percent (15%) of the tier 1 contractor's total contract price as determined at the time the contract is awarded.
IC 5-16-13-9
Each tier 1 contractor must contribute in:
at least fifteen percent (15%) of the tier 1 contractor's total contract price as determined at the time the contract is awarded.
IC 5-16-13-9