for the disbursement of state broadband grant funds.
to which broadband infrastructure has been deployed with the use of grant funds under this chapter, including address-level information for newly connected locations.
A report to the interim study committee on energy, utilities, and telecommunications under this subsection must be in an electronic format under IC 5-14-6.
as appropriate, during the most recent state fiscal year. A report of an audit conducted under this subsection shall be submitted to the interim study committee on energy, utilities, and telecommunications established by IC 2-5-1.3-4(8) in an electronic format under IC 5-14-6 not later than September 1 of the calendar year that includes the end of the state fiscal year covered by the audit.
IC 4-4-38.5-13