When the county surveyor has accepted a petition and marked it filed under section 54 of this chapter, the county surveyor shall make a personal inspection of the land described in the petition and file with the board a written preliminary report stating:
In determining whether the proposed drain is practicable, the county surveyor may consider changing the route of the proposed drain from that set forth in the petition to conform with sound engineering principles.
IC 36-9-27-55
Pre-Local Government Recodification Citation: 19-4-2-4.