Ind. Code § 22-5-1.7-17

Current through P.L. 171-2024
Section 22-5-1.7-17 - Termination of contract with subcontractor for violation of chapter; action to challenge
(a) If a contractor determines that a subcontractor is in violation of this chapter, the contractor may terminate a contract with the subcontractor for the violation.
(b) The termination of a contract under subsection (a) for a violation of this chapter by a subcontractor may not be considered a breach of contract by the contractor or the subcontractor.
(c) A subcontractor may file an action with a circuit or superior court having jurisdiction in the county to challenge a termination of a contract under subsection (a) not later than twenty (20) days after the contractor terminates the contract with the subcontractor.

IC 22-5-1.7-17

Amended by P.L. 6-2012, SEC. 158, eff. 2/22/2012.
Added by P.L. 171-2011, SEC. 16, eff. 7/1/2011.