Current through P.L. 171-2024
Section 22-15-3-1 - Issuance; plan review by county or municipality; expiration(a) The state building commissioner or a city, town, or county certified under subsection (d) shall issue a design release for the construction of a Class 1 structure to an applicant who qualifies under section 2 or 3 of this chapter.(b) The state building commissioner shall issue a design release for the fabrication of an industrial building system or mobile structure under section 4 of this chapter.(c) A design release issued under this chapter expires on the date specified in the rules adopted by the commission.(d) The commission may certify a city, town, or county as qualified to issue design releases, if the city, town, or county:(1) is competent under the commission's objective criteria; and(2) has adopted the rules of the commission under IC 22-13-2-3.(e) A city, town, or county that is certified by the commission under subsection (d) may issue design releases. A design release issued by a certified city, town, or county must be: (1) in accordance with the commission's objective criteria; and(2) for a construction type for which the city, town, or county is certified. All records held by a certified city, town, or county that pertain to the design release must be submitted to the department to be held in a central repository.
Amended by P.L. 187-2021,SEC. 99, eff. 7/1/2021.Amended by P.L. 49-2016, SEC. 7, eff. 1/1/2017.Amended by P.L. 218-2014, SEC. 12, eff. 7/1/2014.As added by P.L. 245-1987, SEC.4. Amended by P.L. 22-2005, SEC.44.