Ind. Code § 22-12-9-3

Current through P.L. 171-2024
Section 22-12-9-3 - Duties of contractors or subcontractors

A contractor or subcontractor proposing to convert a residential property from heating oil to another heat source shall inform the property owner of the requirements of this chapter and include in a contract for labor and materials the cost of:

(1) properly removing and disposing of all flammable or combustible liquids from a heating oil tank; and
(2) either:
(A) removing an outside filling pipe; or
(B) permanently securing the tank against accidental filling.

IC 22-12-9-3

As added by P.L. 131-1997, SEC.7.