In addition, following the issuance of a permit, the board may, to determine compliance with this chapter, inspect the licensee's facility, procedures, and equipment.
The inspection report may not be defaced and must be made available to the board upon request. An identical copy of the inspection report must be filed with the records of the board.
IC 15-18-1-9
Pre-2008 Recodification Citation: 15-2.1-23-3.