Current through P.L. 171-2024
Section 14-30-3-30 - Commission rules The commission may adopt rules to do the following:
(1) Require that increased water runoff resulting from new construction be impounded on the construction site.(2) Permit the requirement of onsite water impoundment under subdivision (1) to be waived upon payment of a reasonable fee by the developer of the new construction.Added by P.L. 138-2018,SEC. 11, eff. 7/1/2018.