The commissioner may exempt the requirement for a permit for the storage, treatment, processing, or disposal of solid or hazardous wastes by a mining operation if:
IC 13-22-3-5
Pre-1996 Recodification Citation: 13-7-8.5-5(f).
The commissioner may exempt the requirement for a permit for the storage, treatment, processing, or disposal of solid or hazardous wastes by a mining operation if:
IC 13-22-3-5
Pre-1996 Recodification Citation: 13-7-8.5-5(f).