Ind. Code § 13-22-12-3

Current through P.L. 171-2024
Section 13-22-12-3 - Fee schedule; annual operation fees

For hazardous waste, the annual operation fees are as follows:

Fee

Land Disposal

$37,500

Incinerator (per unit)

$10,000

Storage

$ 2,500

Treatment

$10,000

Generator

$ 1,565

Postclosure Activity

$ 1,500

Groundwater Compliance Sampling at active facilities (per well)

$ 1,000

IC 13-22-12-3

Pre-1996 Recodification Citation: 13-7-16.1-3(h) part.

As added by P.L. 1-1996, SEC.12.